    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:4509次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 日韩AV无码乱伦丝袜一区| 在线一区二区三区视频观看| 青青草最新在线视频播放| 国产 在线播放无码不卡 | 鱼台县| 亚洲国产av一区二区三| 国产成人自产拍免费视频| 日韩精品一区二区三区费暖暖| 栖霞市| 台北县| 久久精品中文字幕第一页| 国产在线观看免费一级| 97无码人妻一区二区三区蜜臀| 狼人av在线免费观看| 日本a级大片免费观看| 滁州市| 乌拉特前旗| 吉安县| 福清市| 万全县| 精品黄色av一区二区三区| 加勒比在线一区二区三区| 杭锦后旗| 久色精品国产亚洲av麻豆一| 亚洲中文久久久久无码| 松阳县| 国产精品一区久久av| 赞皇县| 亚欧免费视频一区二区三区| 中文字幕日本丰满人妻| 无码精品一区二区三区免费16| 日韩中文字幕在线乱码| 美女丝袜诱惑一区二区三区| 国产亚洲av天天在线观看| 性色av成人精品久久| 一区二区在线视频大片| 亚洲青青草视频在线播放| 一区二区三区日本在线观看| 在线免费观看视频一区二区 | 蜜桃av一区二区高潮久久精品| 亚洲天堂免费一二三四区|